SHTech Co., Ltd. is undertakes the replacement supervision project of the electrostatic precipitator plate, pole line and high-frequency transformer of Ho-Ping Power Plant No. 1, and is responsible for reviewing the ITP (inspection test plan) provided by the construction contractor before construction according to the engineering specifications provided by Hedian. Quality control procedures and other related documents and preliminary work coordination, perform quality control inspections related to various operations during construction, provide daily construction supervision reports and suggestions for improvement, and provide a complete supervision report after completion.
© Copyright SHTech All Rights Reserved. Design by CYnet